CLUB AT BLACK ROCK
Coeur d'Alene, ID
|
Provided sewer treatment, water source development, site disturbance, erosion control plans and construction management services for a 400-lot residential subdivision and an 18-hole world class golf course. Approximate project cost of 40 million dollars at build-out.
[ View more photos] |
 |
HAGADONE HOSPITALITY CO.
Coeur d'Alene, ID |
Provided all design and construction management services for numerous Hagadone Hospitality projects: Coeur d'Alene Resort, Coeur d'Alene Golf Course, Personal Residences for Jerry Jaeger, Duane Hagadone and Brad Hagadone. Approximate project costs totaling over 6 million dollars.
[ View more photos] |
 |
PRAIRIE FALLS SUBDIVISION/GOLF COURSE
Post Falls, ID
|
Provided sewer, water, road and storm design services, land and construction surveying, and construction management services for a 300-lot residential subdivision and 18-hole golf course. Approximate project cost of 9.6 million dollars.
[ View more photos] |
 |
|
INC provided infrastructure design and construction management services for this 29-lot subdivision and golf course re-alignment at the prestigious and historic Hayden Lake Country Club.
[ View more photos]
|
 |
|
INC provided the site preparation & re-configuration of hole #10, as well as the #18 tee box. By adding a beautiful waterfall and other significant water features we achieved a more dramatic "signature" hole for the course.
[ View more photos] |
 |
|
Coolin Sewer District Wastewater Facility Rehabilitation Project ia a $3.9 million dollar wastewater collection and treatment system rehabilitation project constructed through LID, SRF Loan funds, and a 55% STAG Grant and US Army Corps of Engineers 75% Grant. INC has been the key consultant on the project from planning and funding applications to public hearings and agency coordination. INC is also administering the grant and loan funding for the project. This included the design and construction of an 18 million gallon waste water lagoon storage facility, an 80 acre land application irrigation system, two 12,000 gallon lift stations, 5 miles of new force main and the replacement or upgrade of over 450 septic tanks and effluent pumps.
[ View more photos] |